Railway Train Hydraulic Housing

Railway Train Hydraulic Housing


Detail

Description:

Railway Train Hydraulic Housing, High Speed train casting part

 

Material:

EN-GJL-250

 

Weight:

890kgs

 

Application:

High Speed train/Rail transit vehicle/

 

Keywords:

Housing,Rail Train,High Speed train,Resin sand casting, Grey iron

 

Place of Origin:

Hebei, China

 

Brand Name:

OEM

 

Process:

Resin Sand Casting +Machining+Painting

 

Heat Treatment:

No

 

Machining :

CNC vertical lathe+Drilling Machine

 

Procedures:

1. Incoming material inspection 2.Charge mixture 3.Moulding 4.Melting&Pouring 5.Shot blasting&grinding 6.Painting 7.Visual test 8.Machining 9.Process inspection 10.Cleaning 11.Leakage test 12.FQC 13.Packing&stocking 14.Pre-shipment inspection 15.Delivery

 

Tolerance:

+/-0.05mm( or according to the customers drawing indicated)

 

Packing:

Seaworthy Wooden Cases

 

 

Inspection:

MT/UT/RT/100% Visual+100%gauge/CMM

 

Standard:

ASTM. AISI. DIN. BS. JIS. NF. AS.

 

Certification:

ISO9001/TS16949/ISO14001

 

Supply Ability:

1000 Ton/Tons per Month

 

Port:

TIANJIN XIN'GANG

 

Drawing:

Provide by customer, or design according as the sample,in the format of Pro/E, Auto-CAD, SOLIDWORK, CAXA, UG, CAD, CAM, CAE, STP, IGES, etc.

 

Mould :

Design and produced by ourselves according to provided drawings

 

 

FAQs

1. How can I get the quotation? 

Please send us your drawing together with the weight,material and quantity requireed.

 

2. If we don't have the drawing,can you make drawing for me? 

Yes, we can scan your sample and make the drawing for your confirmation. 

 

3. What kind of file format you can read?

PDF, IGS, DWG, STEP, etc. 

 

4. How small and how big you can cast?

1kg~2000kg

 

5. What is the MOQ? 

1pc

 

6. What is the sample and order lead time? 

Sample time: 6-8 weeks including tooling construction. Order time: 4-6 weeks after sample approval, it can be flexible due to complexity or quantity.

 

7. What is your payment terms? 

L/C,D/P, T/T are accepted.

Tooling:100% in advance, Order:50% deposit, 50% before shipment.

 

8. What kind of patterns do you always construct and use? 

We always cast make and cast with aluminum patterns.